ANALISIS KINERJA WAKTU PELAKSANAAN PROYEK KONSTRUKSI STUDI KASUS PROYEK PEMBANGUNAN TERMINAL MULTI PURPOSE DAN FASILITAS PENDUKUNG DI KUALA TANJUNG, SUMATERA UTARA

Authors

  • . . suarno

DOI:

https://doi.org/10.30606/aptk.v10i2.1591

Keywords:

Completion schedule some Multi Purpose Station Construction Project and Supporting Facilities in Kuala Tanjung, North Sumatera in 2017 delayed. The condition always associated with risk in a certain scale. Risk analysis needed to reduce risks and solve t

Abstract

Completion schedule some Multi Purpose Station Construction Project and Supporting Facilities in Kuala Tanjung, North Sumatera in 2017 delayed. The condition  always associated with risk in a certain scale. Risk analysis needed to reduce risks and solve the condition. Results of research conducted  identify five major risks, changes in design during construction, changes in construction method, unrealistic schedule, short engineering works, material delays. Fifth of risks identified in the high risk category. The level influence of risk to completion plan Multi Purpose Station Construction Project and Supporting Facilities in Kuala Tanjung, North Sumatera with the probability 80% is 11,19% or 109 working days of the planned schedule 975 days is classified as high risk. After risk mitigation and control the probability 80% , time delay decrease to 6.45% or 63 days.

References

EE. Mangindaan, Kementrian Perhubungan Republik Indonesia, Lampiran Peraturan Menteri Perhubungan Republik Indonesia, Nomor PM 20 Tahun 2012, Rencana Induk Pelabuhan Kuala Tanjung Indonesia.

Project Management Institute, 2013, 5th edition, A Guide to the Project Management Body of Knowledge (PMBOK Guide).

Sugiyono, 2003, Statistika untuk Penelitian, Alfabeta, Bandung

Sukirno, 2015, Tesis, Pendekatan Risk Management pada Proyek Konstruksi untuk Meningkatkan Kinerja Waktu dan Biaya (Studi Kasus : Proyek Ampuh Pressure Maintenance di Duri, Riau), Universitas Riau.

Sandyavitri, A., 2014, Risk Analysis for Riau Regional Water Supply Projects (SPAM), Indonesia, Universitas Riau

Sandyavitri, A., 2008, Media Komunikasi Teknik Sipil, Desember 2008, Manajemen Resiko di Proyek Konstruksi

Downloads

Published

2018-08-04